ABOUT
About this spot
The Tateyama Ropeway is a section of the Tateyama Kurobe Alpine Route in Tateyama, Toyama Prefecture, linking Daikanbo Station and Kurobedaira Station. It is about 1.7 kilometers long with a height difference of about 500 meters (Daikanbo is at 2,316 meters and Kurobedaira at 1,828 meters). It is Japan's longest one-span ropeway, with no support tower at all along the way, and for about seven minutes you glide through the air with the mountains filling the large windows. The slope length is 1,710 meters and the horizontal length 1,638 meters, and construction cost 1.7 billion yen.
The line opened on July 25, 1970, and its cars were renewed in 1988 and 2012. It is operated by Tateyama Kurobe Kanko. Daikanbo Station connects with the Tateyama Tunnel Trolley Bus and Kurobedaira Station with the Kurobe Cable Car, so it is an essential link for anyone crossing the Alpine Route. The Kurobe Cable Car at Kurobedaira is said to be the only fully underground funicular in Japan.
The highlight is the unobstructed view that only a ropeway without towers can give. Through the large windows of the cabin, the Ushirotateyama range opens out in every direction.
The ropeway runs every 20 minutes during the day; each cabin holds 81 people and the top speed is 7.5 meters per second. The Tateyama Kurobe Alpine Route is a 37.2-kilometer mountain route from Tateyama Station in Toyama to Ogizawa Station in Nagano, linking cable cars, buses and the ropeway, and its highest point is Murodo at 2,450 meters. It usually operates from mid-April to mid-November, and the whole route opened in June 1971.
The best seasons are summer, when the greenery is dazzling, and autumn, when the mountains change color. It can feel chilly even in summer at this altitude, so bring a jacket.
The Alpine Route operates seasonally and may stop because of weather or maintenance, so please check the official website before you go. The ropeway ride itself takes about seven minutes, and about an hour including views and a walk at the stations. Crossing the whole Alpine Route takes close to a full day.
Sources
This article was written from the official, municipal and tourism-association sources above, and checked against them separately from the writing. Editorial policy
Last updated November 21, 2026







